Naval Air Systems Command · PEO(U&W)·NAS Patuxent River, MD
PMA-281 Executive Decision Intelligence & Modernization Quarterly
PEO(U&W) Program Executive Research Publication · Volume XIV (2026)

Strike Software Modernization & Executive Decision Intelligence

Empirical Software Velocity Benchmarks, Modular Open Systems Architecture (MOSA) Decoupling Patterns, and Five-Year Total Ownership Cost Models for Maritime Strike

Prepared for PMA-281 Program Managers, Chief Software Architects, and Integrated Product Team (IPT) leads overseeing JMPS-M, NGMP, TTWCS Block V, and UMCS MQ-25A Stingray.

Acquisition Gate Readiness

APB & Gate Review Brief

FY27–FY31

Filter any PMA-281 strike program below to compare legacy monolithic sustainment against containerized MOSA delivery and export a board-ready memorandum.

Select PMA-281 Strike Program Baseline
Architecture Comparison Lens
PEO(U&W) · PORTFOLIO·Strike Planning & Execution Systems · NAS Patuxent River

PMA-281 Enterprise Strike Planning & Weapon Control Portfolio

Transitioning four flagship maritime strike planning baselines from airframe-coupled desktop monoliths to containerized Modular Open Systems Architecture (MOSA) microservices cuts fleet software delivery from 142 days to 6.5 days while avoiding $105.2M in five-year sustainment overhead.

Target MOSA Containerized PostureC2C24 Continuous ATO

Shared FACE 3.1 and OMS/UCI containerized strike services running on hardened Navy base images with 93.5% automated Continuous Authority to Operate (cATO) control inheritance.

Fleet Platforms Served: CVN Carrier Air Wings, DDG-51 / SSN Tomahawk Strike, MQ-25A Stingray, F/A-18E/F, F-35C, E-2D
Fleet Release Cycle Time
6.5 Days21.8x Faster Fleet Delivery

Down from 142 days in legacy waterfall via automated C2C24 container builds and signed air-gap delta bundles.

MOSA Open Interface Coverage
94.6%FACE 3.1 · OMS/UCI · MIL-STD-3014

Decoupled portable mission solvers with Government Purpose Rights (GPR) and 93.5% inherited NIST 800-53 controls.

5-Year Total Ownership Cost Avoidance
$105.2MFY27–FY31 Net Savings

Reduces 5-year lifecycle expenditure from $284.0M to $178.8M across 64 fleet sites by eliminating sole-source ECPs.

Section I · Empirical Benchmarking & Target Architecture

Peer DoD Software Velocity & MOSA Decoupling Blueprint

Comparing All PMA-281 Portfolio modernization metrics against peer DoD software factories and inspecting the 4-stage Compile-to-Combat (C2C24) architecture.

Cross-Service Empirical Comparison

DoD Software Factory Benchmark Atlas

Lower is better: Measures average calendar days from code commit to authorized fleet deployment aboard CVN/DDG tactical nodes.

PMA-281 Target MOSA (6.5d)Peer DoD Software FactoriesLegacy Waterfall (142d)
Source: PEO(U&W) DORA & C2C24 Telemetry
Interactive Architecture Blueprint · Click Any Stage10 U.S.C. § 4401 · C2C24

Four-Stage Strike Software Modernization Flow

Select any architectural stage below to inspect how PMA-281 transitions mission planning and weapon control from monolithic binaries to continuous afloat delivery.

NAVAIR PMA-281 COMPILE-TO-COMBAT IN 24 HOURS (C2C24) & MOSA BACKPLANESTAGE IDecoupled Strike SolversFACE 3.1 Portable SegmentZero Airframe DLL LockSTAGE IIMOSA Open Message Bus10 U.S.C. § 4401 Open ICDsVendor-Agnostic APISTAGE IIIC2C24 Continuous ATONIST OSCAL · DoDI 8510.01< 24 Hr AccreditationSTAGE IVAfloat CVN & Ready Room EdgeSigned Air-Gap Delta Bundles6.5-Day Fleet CadenceClick any stage node above to inspect its executive mission impact below
STAGE I · FACE 3.1 Portable Segment

Decoupled Strike Solvers — JMPS-M, NGMP & TTWCS Algorithms

84% Code Reuse
Across 4 PMA-281 Strike IPTs

Mission Modernization Impact: Extracts core strike planning algorithms into stateless, reusable software containers with Government Purpose Rights (GPR). A single threat-masking update now deploys simultaneously across F/A-18E/F, F-35C, and MQ-25A planning cells.

Legacy Constraint Resolved: Route optimization, fuel calculation, and weapon-target pairing logic were compiled directly into airframe-specific Windows desktop executables, requiring a full system rebuild for every ordnance update.

Section II · Executive Advisory Research & Economic Modeling

Magazine-Grade Advisory Briefs & 5-Year Navy TOC Calculator

In-depth acquisition research briefs paired with an interactive five-year Total Ownership Cost (TOC) model for APB and PEO(U&W) decision gates.

EXECUTIVE BRIEF VOL. 14 · NO. 1·November 2026 · Patuxent River Edition·6 min executive read
MOSA & 10 U.S.C. § 4401 Governance

Breaking the Airframe Monolith: Economic & Operational Returns of FACE 3.1 Decoupling in Maritime Strike

How separating Unique Planning Components (UPCs) from host desktop operating systems eliminates redundant regression testing across carrier air wings.

Executive Bottom Line Up Front (BLUF)

Programs that isolate mission-planning math (route optimization, terrain masking, fuel burn, and radar cross-section modeling) behind open FACE 3.1 and OMS/UCI interfaces reduce cross-platform integration costs by 41% while cutting ordnance integration timelines from 18 months to 4 weeks.

For two decades, naval aviation mission planning relied on monolithic desktop builds in which airframe-specific Unique Planning Components (UPCs) were tightly bound to Windows COM+ libraries. Whenever an Operational Flight Program (OFP) or weapon envelope changed on the F/A-18E/F, EA-18G, or F-35C, program offices faced cascading regression cycles across the entire desktop baseline.

By transitioning to the Next Generation Mission Planning (NGMP) architectural pattern, PMA-281 treats mission solvers as stateless, containerized services governed by Government Purpose Rights (GPR). Squadron planners in the Carrier Intelligence Center (CVIC) interact with a unified, zero-footprint interface while validated container modules execute deterministic 4D deconfliction in the background.

Empirical Trade-Study Synthesis

Evaluation DimensionLegacy BaselineTarget MOSA StateVerified Delta
New Weapon / Emitter Integration Lead Time18–24 Months (Sole-Source Prime ECP)3–6 Weeks (Open Interface Container Module)85% Schedule Compression
Cross-Platform Software Reuse (CVN / DDG / USMC)18% Shared Utility Libraries84% Shared OCI Strike Planning Services4.6x Engineering Leverage
Interface Data Rights PostureProprietary Binary Headers100% Government Purpose Rights (DFARS 252.227-7014)Zero OEM Re-Compete Lock-In
Recommended Acquisition Gate Action

Mandate published Protobuf / FACE 3.1 Interface Control Documents (ICDs) as a Contract Data Requirements List (CDRL) gate prior to Critical Design Review on all FY27–FY31 strike software task orders.

Reference Authority: PEO(U&W) Strike Software Modernization Benchmark Study · 10 U.S.C. § 4401 & DoDI 5000.87 Analysis